T20-1570 – Galiwin’ku – Construction of New Dwellings and Room to Breathe Renovations over 5 Years – Closes 2nd of December 2020

All quotes for this project are required to be submitted by Close of Business Wednesday 2nd December 2020

Quotes are to be submitted with the completed Local Content and Lump Sum Price Breakdown  Forms (below).

Local Content Form – Galiwin’ku

T20-1570 – Lump Sum Price Breakdown

Documents

91837.00.R.001.Rev0 – Geotechnical Report

 500886-003 – Aurecon Ground Investigation

Report – Nov 2018 

Conditions of Contract 

NTG2019968 Rev 0 – Geotechnical Report 

Standard Specification for Small Building Works 2018 

T20-1570 – RFT

Attachments

A – RCH 1 Housing Ancillary Specification – 2019

B – RCH 2 Remote Community Housing – Schedules – 2019

C – RCH 3 Remote Community Housing – Design Guidelines – 2019

E – AAPA – Galiwinku Dec 2014

F – AAPA Authority Certification Sept 2016

J – Generic Safety in Design Report – Northern Region

M – Galiwinku VSA O – Dwelling Breakdown

Attachment D – handover documents

Form 00 – Documentation Requirements for DHCD Works

Form 01 – Notification of Asset Handover (10 Days)

Form 01A – Notification of Asset Handover (5 Days)

Form 02 – Confirmation of Asset Handover (3 Days)

Form 03 – Contractors Handover Documentation – Checklist

Form 04 – Asset Handover Checklist

Form 05 – DHCD – Property Acceptance Form

Form 06 – AIS Handover Form

Form 07 – Defects Liability Correction Period – Inspection Record

Drawings

New Dwellings

CIVIL Drawings – ALL

Drawings for Information Only

H – PWC services – subdivision

PAWA Drawings – ALL

Schedule 3 – 3 Bed House

Schedule 4 – 3 Bed House

Schedule 5 – 3 Bed House

Schedule 6 – 3 Bed House

Schedule 7 – 4 Bed House Type H

Schedule 8 – 4 Bed House Type A-G

Schedule 9 – 5 Bed House

Schedule 10 – 2 Bed Duplex Type A

Schedule 11 – 2 Bed Duplex Type B

Schedule 12 – 3 Bed Duplex

Drawings – Room to Breathe Renovations

RTB Standard Construction Details

RTB Standard Details

RTB Structural ALL

Schedule 13 – lot 133

Schedule 14 – lot 184

Schedule 15 – lot 219

Schedule 16 – lot 232

Schedule 17 – lot 241

Schedule 18 – lot 314

Schedule 19 – lot 453

Schedule 20 – lot 476

Schedule 21 – lot 576